Recent Projects

Deep Creek Canyon Bridges

The project consisted of replacement of replacing seven bridges along highway 12 in deep creek canyon.  Due to the remote nature of the road and lack of available detours the bridges were constructed using accelerated bridge construction (ABC) techniques.  Each bridge was constructed in a period of 72 hours…

Briarwood Water Tank

This project consisted of replacing an old steel water tank with a new 750,000 gallon pre-stressed concrete water tank.  Extremely expansive and corrosive soils required a unique solution to meet the stringent manufacturer design constraints for the proposed tank.  Construction of the proposed tank is planned for 2015.

TownePlace Suites Hotel

This project consists of constructing a new 55,500 square foot, four story, wood framed hotel with a in ground pool and new parking area in Billings, Montana.  Poor subsurface soil conditions, high groundwater table, and large building loads required innovative ideas to provide a cost effective solution to support…

BNSF Siding

Rock socketed pile installation observations and construction materials testing for two BNSF siding projects:  Rosebud and Fallon.